North Mountain Geohazards SOQ
Geohazard Overview | SOQ
rviews
5
Update Qualitative Analysis
6
Quantitative Risk Assessment
Use field data and interviews to finalize the qualitative analysis and site ranking. Agree with owner how many sites advance to subsequent stages.
7
Conceptual Mitigation
Assess likelihood of geohazard events in terms of annual probability of occurrence. Assess consequence in terms of dollars if an event occurs. Compute annual risk (in $$) of a geohazard event for each site.
8
Benefit-Cost and Project Planning
Prepare simple conceptual/high level mitigation designs and cost estimates based on the experience of subject matter experts.
9
Mitigation Design and Construction
Perform a benefit-cost analysis for site mitigation and collaborate with the owner
10
Monitor
Perform final design of mitigation, including additional, more detailed site assessments, and preparation of contract documents. Provide support during the construction phase.
to develop mitigation projects to advance to
Install monitoring where warranted. Continue periodic site visits to watch for increases in likelihood or consequence that warrant sites being reconsidered for mitigation.
planning stage and ultimately design and construction.
5
Made with FlippingBook Online newsletter creator