GFL-Solid Waste Engineering Services SOQ

Woodland High BTU RNG Landfill Gas-to-Energy Woodland Meadows Gas | Michigan The Woodland Meadows Gas-to-Energy project converts 6,600 scfm of LFG to RNG. For this project, our team provided the detailed design and construction contractor Requests for Information support. The detail design included a new substation to power the facility. The majority of gas upgrading equipment was a patented carbon dioxide (CO2) and nitrogen gas molegate system. Removal of O2 and thermal swing adsorption was also included. Detail design included all interconnecting piping and supports, building, and electrical. We also provided plant betterment services a couple of years after the facility went operational to add carbon beds prior to pipeline injection. These beds removed any oil carryover from the gas processing equipment.

Commercial Waste Material Characterization City of San Jose | San Jose, California With 16 anaerobic digesters, the GreenWaste Renewable Energy Digestion facility is the largest dry fermentation anaerobic digestion project in the U.S. This facility is an organic waste processing and renewable power generation facility. WSP provided on-call waste characterization services related to franchisee contract compliance and recommending process improvements to their commercial collection, recovery and processing systems. The residuals generated from the processing facility were sorted to document system performance for the purposes of administering the City’s contractual agreements with Republic Services and Zero Waste Energy Development.

PaPgaeg7e070

Made with FlippingBook - Online Brochure Maker